CP00703 Chizhou section of the expressway from Dongzhi to Jiujiang

 

CP00703                                                  

Name: Chizhou section of the expressway from Dongzhi to Jiujiang

Introduction: The Chizhou section of the expressway from Dongzhi to Jiujiang is planned to be 40km long. The speed is 100km/h. It is two-way four-lane road and the road bed is 26 meters wide. The construction is planned to last 3 years.                                                                            

Total Investment: 193,700,000 US Dollars

Means of cooperation:  JV, Contractual Cooperation

Anyone who has the information meets the inquiry is welcome to contact: This email address is being protected from spambots. You need JavaScript enabled to view it.

Please publish modules in offcanvas position.